Deploy the HyperV cluster to virtualize the infrastructure and reduce the count of Physical servers. The setup was built with Dell Hardware and Windows Server 2012R2 HyperV failover cluster.
P2V MS Exchange 2010 from Physical to Virtual environment.
Upgrade Proxy server from Microsoft ISA 2004 to Microsoft TMG 2010.